All You Need To Know About
Date
Headings
 |
 |
|
|
This article refers to version 2008.
Click for Version 2006 |
| |
| |
| Date headings .... they appear above the
schedule area and there are quite a few to choose from. End of
story. Right? Not necessarily! Learn how to master the
date headings and you have mastered a key component of your Milestones
schedule. Read on. |
| |
The straight story, in a nutshell -
with references:
|
| Date Heading
Choices: |
 |
|
|
| Date Headings appear above
the schedule area. |
| |
 |
|
Choose
from 35 standard date heading
styles, ranging from years (even
centuries) to minutes.
MORE |
| |
 |
|
Headings can be above the schedule,
below, or both.
MORE |
| |
 |
|
Milestones Professional and Project
Companion offer custom headings
which extend date heading
flexibility. |
| |
 |
|
Use
"Curtains" to extend the
date headings into the schedule area
and highlight a holiday shutdown or
critical schedule period.
MORE |
| |
 |
|
Show a
day or month at a time and "scroll"
horizontally through your schedule.
MORE |
| |
 |
|
Easily
change the font size, style, color
and shading of each heading level.
MORE |
| |
 |
|
Milestones software supports dates
from the year 100 CE (A.D.) through
the year 7000 CE (A.D.) MORE |
| |
|
|
|
|
| |
|
|
|
Choose
from 35 standard date heading styles, ranging from years to minutes.
|
|
|
|
| Up to 4 levels
of headings per schedule. |
| |
 |
|
|
|
|
|
|
How
to set the start and end dates for theschedule:
|
-
Click the Dates
tab.
-
In the Start and End
Dates section use the Calendar icons to change the dates.
|
|
 |
|
|
How
to set up the Date Headings:
|
| |
-
Click directly on the
headings.
-
The Toolbar will
change to the Selection tab Current Object: Date
Heading. All options for headings are now available.
|
|
 |
|
|
Choose from a variety
of Headings:
|
| |
|
 |
| |
| Calendar years, quarters and
months |
|
 |
| |
| Fiscal years, quarters and
months |
|

|
|
|
|
Custom Headings extend
flexibility (Milestones Professional and Project Companion):
|
|

|
- Milestones
software supports dates from the year 100 CE (A.D.) through the year
7000 CE (A.D.). For dates outside this range, use
custom headings.
|
|
Headings can be above the schedule, below
the schedule (or both):
|
| |
| You have the option to place
the date headings at the top, the bottom, or both the top and bottom of
your schedule. By default, Milestones Professional places the date
headings at the top of your schedule. |
| |
| To change the date heading placement: |
-
Click directly on the
headings.
-
The Toolbar will
change to the Selection tab Current Object: Date
Heading in the Date Headings section check on Show at
top and/or Show at bottom.
|
| The schedule below shows the
headings both at the top of the schedule and at the bottom: |
| |
|
|
|

|
| |
|
Change the appearance of the Date Headings:
|
| |
| To
color and add special effects to the Date Headings: |
| |
|

|
| |
-
Click directly on the
headings.
-
The Toolbar will
change to the Selection tab Current Object: Date
Heading all options for headings are now available.
-
In the Background section
choose a background color for each heading.
-
In the Effects section
choose the fade effect for each heading.
-
In the Target Color section
choose the target color for the fade effect for each heading.
|
|
| Change the font style/size and /or
color: |
| |
|
|
| |
-
Click directly on the
headings.
-
The Toolbar will
change to the Selection tab Current Object: Date
Heading all options for headings are now available.
-
In the Date Headings section
choose the font color, Font type, Font Size for each heading.
|
Scroll Horizontally through your
schedule by time period:
|
| You can scroll through your
schedule by any number of days so that you have a “sliding” time window. |
| |
| How to scroll your schedule. |
|
|
-
Click the
Dates tab.
-
In the
Date Range Tools section, choose Shift displayed range backward.**
-
In the
Date Range Tools section choose Shift displayed range forward.**
**
Shift+PageUp and Shift+PageDown can be used instead |
| By default the days to shift
is 7 |
| |
| Change the days to shift. |
-
Click the
Dates tab.
-
In the
Start and End Dates
section click the Full Dialog icon
.
-
Click the
Yearly/Monthly tab.
-
Under Calendar Range
Scrolling, enter a value for Working days to scroll with Shift+PageUp/PageDn.
-
Enter a number of days.
|
|
Remove a date heading:
|
| |
-
Click directly on the
headings.
-
The Toolbar will
change to the Selection tab Current Object: Date
Heading.
-
In the Date Heading section, click
the scroll arrow for the date heading you wish to
delete.
-
Choose None.
|
|
|
|