Dependencies
|
 |
|
|
| There are various methods to move parent tasks
(predecessors); not all methods result in dependent tasks moving
(successors). Below is a guide to when dependent tasks will move.
Dependent tasks will not move unless Dependency Mode
is turned on. Thus, the examples below assume that Dependency Mode is
on. |
| |
| Dependency mode is a global setting which controls
whether or not dependent symbols will move when a parent symbol moves.
|
| |
 |
Easy
Task Linking
|
|
Watch
our "Dependencies" movie |
| |
| It's possible to select a range of task lines and link them together in one
operation. |
|
| Example:
Here is a
schedule with 7 independent tasks. |
| |
|