On the left, two columns 1) %
complete and 2) Task Name
On the right, three columns 1) Baseline Cost, 2) Actual
Cost, and 3) A simple calculation column which subtracts Actual Cost from
Baseline Cost. Stoplights are displayed based on whether the Actual
Cost exceeds the Baseline Cost.