New features and fixes to Milestones Project Companion 2006
Is your copy of Milestones Project Companion 2006 up-to-date?
Check under
Help | About Milestones | System Info for a Rev.
date
Download this Update if your Rev date is older than the current revision
date of 9/18/2007.
List of new features and fixes:
The most recent new features and fixes are at the top of the list.
September 18, 2007
Corrects a problem with hyperlinks being left off of the HTML map
command when the hyperlink parent was the last task line on a page in a
tiered hierarchy output.
Corrects a problem with an error 13 in earned value timescaled
graphs.
June 26, 2007
Added the Direct to MS Project... option on the File, Export menu.
June 26, 2007
Corrects problems with Taskline Hyperlink importing from MS Project
sometimes causing an Error 13 message.
June 25, 2007
Corrects more problems with Earned Value (EV) values not importing
correctly from MS Project.
June 21, 2007
Corrects problem with Earned Value (EV) values not importing
correctly from MS Project.
June 13, 2007
Corrects problem with SV values not importing correctly from MS
Project.
February 14, 2007
Corrects Copy all Pages to Powerpoint problem with Microsoft Office
Powerpoint 2007.
February 13, 2007
For the Microsoft Project interface, Milestones with duration of zero
will now be filled and considered complete if percent complete is 100.
For the Microsoft Project interface, when using a Master schedule
with a resource pool, corrected the way the Milestones interface accesses
the resource pool.
December 19, 2006
A new option was added to the Size/Color/Summary tab of the Symbol
Properties dialog box. The new option is a checkbox labeled "Ignore Size
Override when placing text and date". If checked the placement of the
symbol text and symbol date will be controlled by the symbol size
settings for the entire chart rather than any override size attached to
the symbol. This overcomes the problem of poor text and date placement on
non-square symbols with a size override. This is especially useful for
rectangular custom symbols that might need to drawn at a larger than
normal size in order to show the needed detail.
A correction was made that should prevent a crash when SnagIt or
other file based printer drivers are set as the default printer.
A correction was made in the MS Project Import Wizard to ensure that
the various option names display correctly.
October 25, 2006
Critical tasks in the Gantt step-by-step option in the wizard are
filled red past the status date.
Includes option to tag symbols on Milestones Professional schedule
when schedule is exported to MS Project.
October 23, 2006
When a ValueSet is cleared any values for the cleared ValueSet
attached to symbols get reset to 0.0.
September 27, 2006
In the MS Project Refresh Wizard, the Gantt option has a new import
format: Current Plan + Baseline w/Status. The status date field to use is
obtained from the Optional Combo 1 dropdown box in the final screen of
the import wizard.
August 29, 2006
In the MS Project Refresh Wizard, the Append New tasks selection has
been returned to the Refresh option.
August 14, 2006
In the MS Project Import Wizard, the Resource - Detailed option now
supports additional columns.
July 27, 2006
-Corrected a problem in the MS Project import feature that prevented
start1/finish1 optional symbols from being connected.
-Fixed issues related to vertical dependencies (applies to all formats)
-Added option "Recompute start/end dates" to refresh
-Fixed feature which sets date range for individual pages - wasn't
working in all cases on Summary - Presentation Timeline
-Added warning message to Custom/SPI Percentage Bar choice to prevent
error condition
-Fixed gantt chart bars to display both start and end date for single
day activities which are not zero duration.
July 13, 2006
The MS Project interface Performance import was enhanced to better
handle tasks of short duration.
July 10, 2006
The MS Project interface Gantt import was enhanced to better handle
tasks of short duration.
June 15, 2006
In the MS project Import Wizard, a problem with Earned Value #2
graphing was corrected.
In the MS project Import Wizard, a problem with performance/stoplight
(#7) chart was corrected.
In the MS project Import Wizard, a problem with the custom option for
Summary-condensed gantt optional columns import was corrected.
June 2, 2006
Corrected a problem with percent complete displaying an incorrect
value in the Earned Value reports.
Corrected a problem in how Milestones/MS Project Refresh handles a
Flag 10 field containing custom formulas.
Corrected the problem with Hide Legend not working for floating
legends.
May 19, 2006
Added Deadline dates to the list of fields that can be refreshed
using Milestones/Project refresh.
April 25, 2006
Corrected problem which could cause percent completes in Summary
lines to display incorrectly.
April 14, 2006
For MS Project Import, fixed column headings in Performance - Cost
Variance and fixed Summary charts to remember extra columns.
April 7, 2006
Corrected the Help | About | Program Key dialog to properly indicate
that all letters in the Program Key entered are case sensitive.
April 3, 2006
An issue with imported baseline symbol start dates from MS Project
being off has been corrected.
March 22, 2006
Corrects serious problem with 3/21/06 rev concerning an issue with
column cells sometimes getting the wrong text when the Text tool is used
to edit cells on-screen.
MS Project duration columns inserted via the Insert menu now get the
proper attributes.
Templates for imported MS Project Performance charts updated.
March 21, 2006
For custom MS Project import templates, the files names are saved on
the Open and Save As... menus.
Resource charts 1 and 2 now offer the ability to import multiple
optional columns.
Two Gantt step by step optional symbology problems have been fixed.
March 1, 2006
Fixed problem that prevented trial version from allowing 20 file
saves.
February 27, 2006
Correction made to MS Project import to allow refresh of Physical %
Complete columns.