New Features and Fixes to Milestones Project
Companion 2008
Is your copy of Milestones Project Companion 2008 up-to-date?
Check under Help | Keys and Information |
View System Info for a Rev. date,
or, if you are not using the Enhanced Toolbar, check under Help |
About Milestones | System Info
Download this Update if your Rev date is older than the current
revision date of 1/5/2010.
List of new features and fixes:
The most recent new features and fixes are at the top of the list.
January 5, 2010
Updated to correct problem with MS Project import template
BaselinePlusActualsWithStatus.
January 4, 2010
Updated to correct error with MS Project import.
December 17, 2009
Updated to correct problem with the Clear Current Date Override
button in the Dates menu not working.
October 10, 2009
Updated to include Compatible with Windows 7 logo.
October 2, 2009
Allows Refresh Flag column to be selected, rather always
defaulting to Flag17.
September 19, 2009
Fixes bug in Project Refresh where times were not always being
refreshed properly.
September 18, 2009
Fixes bug in Project Refresh dialog box. Sometimes option not
being checked or un-checked can causing errors to result in refresh
selections.
September 1, 2009
Improved the Tools | Program Options | Rereg feature to do a
better job of recreating necessary registry entries when run under
Vista 64.
August 21, 2009
Corrected a problem with how program settings get saved in the
registry under Windows 7.
August 17, 2009
Corrected a problem where symbol movement tooltips would not
appear on a secondary monitor configured to be logically to the left
of the primary.
August 13, 2009
Corrected a problem where schedule-local holidays were not being
subtracted from task duration when work both weekend days was also
set.
July 31, 2009
Corrects a problem with Symbol Mark font color settings being
ignored.
July 29, 2009
Corrects a problem where Automation Tagged date SmartColumns were
being altered after a MS Project Refresh.
Fixes error with ReReg not always reregistering Milestones file
types completely on Vista 64.
July 24, 2009
Corrects a problem where Automation Tagged date SmartColumns could
not be used in calculations.
Fixes error with Export to Project causing error when no percent
complete column existed on the schedule being exported.
July 8, 2009
Corrects a problem with after status gradient filled connectors
not displaying the after status fill properly when the start date is
also after the status date and the end date is off-screen.
This update also includes the latest PDF writer software which
seems to correct some issues with truncated PDF files when the chart
contains lots of gradient filled areas..
June 18, 2009
Corrects a problem with MS Project import concerning an issue with
custom templates not retaining toolbox settings for schedules
originally created with the Gantt step-by-step template.
June 1, 2009
Corrects another Error 438 error message.
Adds a feature to "refresh from Microsoft Project Server" which
will allow selection of schedules residing on Project Server when
refreshing.
Corrects run-time errors identified associated with
refreshing when no schedule tags were assigned to the file.
May 26, 2009
Corrects an Error 438 error message displayed when Microsoft
Office Project Refresh updates projects imported from Project Server.
May 22, 2009
Microsoft Office Project Refresh updated to correct a problem with
an Error 13 message being displayed.
In the Microsoft Office Project interface a finish variance
schedule format / stoplight issue was fixed.
May 20, 2009
Microsoft Office Project Refresh updated to correct a problem with
the wrong file being opened for refresh in some cases.
May 4, 2009
Microsoft Office Project Refresh updated to correct a problem with
double open file dialogs being displayed.
April 22, 2009
Microsoft Office Project Refresh updated to also refresh projects
imported from Project Server.
Added option to Tools | Program Options under Files and Automation
to enable creation of UTF-8 encoded HTML files. By default all HTML
files created by Milestones are UTF-16 encoded. UTF-8 encoded files
may be more appropriate for non-IIS web servers.
March 24, 2009
Fixed problem with Date control and other dialogs not appearing in
the correct location on a multi-monitor system when the secondary
monitor is configured left of the primary.
In the Microsoft Office Project import wizard, in Gantt
Step-By-Step ValueSets, some timescaled valuesets were not being
created.
March 13, 2009
Problem in Internet Publish of Tiered Hierarchy format where the
last used line (under certain conditions) appears unexpectedly in the
output has been corrected.
In the Microsoft Office Project import wizard, fixes a problem
with summary-scatter chart symbols being tagged with "alltasks"
instead of symbol text field.
In the Microsoft Office Project import wizard, fixed error in
Summary - scatter chart.
Fixed problem with Copy All Pages to Powerpoint when the regional
setting is Norwegian.
February 18, 2009
In the Microsoft Office Project import wizard fixed problem with
the Earned Value Dashboard template.
In the Microsoft Office Project import wizard for custom
templates, it's now possible to select a flag with which to filter the
Microsoft Project schedule.
In the Microsoft Office Project import wizard in Gantt/
Step-by-Step, 1 day milestones were not colored red when the "Color
Critical Tasks Red" option was selected.
In the Microsoft Office Project import wizardPrevious resource
limitation of 300 eliminated.
In the Microsoft Office Project import wizard fixed problem with
Summary - Scatterchart symbol text.
Individually rolled up symbols to summary bar limit increased from
200 to 500.
Problem with start schedule wizard when short file names
deactivated fixed.
Crash when doing symbol link report on very large schedules fixed.
November 13, 2008
In the Microsoft Office Project import wizard fixed problem with
Milestones handling of date orders other than MM/DD/YYYY.
November 10, 2008
In the Microsoft Office Project import wizard fixed problem with
Milestones Refresh handling of date orders other than MM/DD/YYYY.
November 7, 2008
In the Microsoft Office Project import wizard fixed problem with
symbol text not appearing on milestones (zero duration tasks).
October 28, 2008
Fixes the issues related to dynamic rollup in the Microsoft Office
Project import wizard (minor problem), plus a minor problem in the
Microsoft Office Project import help file.
October 13, 2008
In the Microsoft Office Project import (Refresh) feature, an Error
9 message was corrected.
In the Microsoft Office Project import feature, a Filter
issue, and a problem with Gantt-Roadmap/Custom Import were
corrected.
September 30, 2008
In the Microsoft Office Project import feature, some valuesets
were not displaying on Earned Value Graphs.
September 15, 2008
In the Microsoft Office Project import feature, some baseline
dates were not appearing on some import formats.
September 3, 2008
Print Preview screen corrected to appear on correct monitor if
started on a multi-monitor system.
August 29, 2008
Resize-after-edit issues with embedded Milestones objects in
PowerPoint have been corrected. This option is on by default but can
be turned off in the Tools | Program Options | general screen.
If the Graphics properties dialog is displayed, on exiting the
dialog, the Edit menu appears, instead of leaving a non-active Graphic
selection menu in place.
Display of imported bitmaps has been improved.
July 15, 2008
In the Copy All Pages to PowerPoint feature, there was a problem
that when slides added to the current presentation, slides were added
incorrectly. Problem has been corrected.
In the Microsoft Project Refresh feature there is a new
enhancement: It is now possible to select a Microsoft Project Text
field and have the text field populate the Milestones constraint
field. This can be selected on the refresh options dialog box.
Documentation for this feature can be found by selecting Microsoft
Office Project Importing on the Help menu.
On the format menu on the Enhanced Toolbar, there is now a menu
next to the Shadows/Highlights button that enables you to selectively
remove all symbol highlighting or all shadows.
A new horizontal connector was added. This new connector is a Null
connector, i.e. it is always invisible. It will appear only if View |
Highlight Invisible Symbols is checked. This connector, when paired
with the Null symbol, Symbol 28, can be used to temporarily hide tasks
from view. It could be useful in a "declutter" template which could be
used to hide some less important task bars temporarily without having
to delete them.
A correction was made to the display position of symbol text set
to display below the symbol at an angle of 120, 135, or 150 degrees.
June 26, 2008
A new Create Vertical Link section has been added to the Symbol
Selection menu under the Vertical Links tab. This is a third way to
insert vertical links which was done to make it easier to insert links
on dense schedules with overlapping or hard to select symbols. This
option lets you select the parent and target symbols using any
combination of mouse or keyboard. The currently selected Vertical
Connector from the Toolbox is used to insert the connection when the
Connect Now button is pressed.
June 13, 2008
When importing from Microsoft Office Project, it is now possible
to tag symbols with WBS number. It is also possible to refresh with
the WBS number.
In the Microsoft Office Project interface, the performance for
refresh using non-UniqueID (text field or WBS) has been significantly
improved.
May 19, 2008
In the Microsoft Project Interface, a slowness issue with
Milestones Refresh was corrected.
April 29, 2008
Milestones Project Interface, Added abbreviations for symbol
automation fields, to be used for Milestones Project Refresh:
Fixed background color issue with
Milestones Project Interface Dynamic Rollup coded summary import format.
Fixed an issue with the Milestones Project
Interface Coded Summary - Coded Symbols.
In Milestones Project Interface, Milestones
Refresh, added an option to Create Report when refreshing a Milestones
schedule from Microsoft Project. The report is placed both on the
clipboard and in the user's My Documents folder. The name of the report is
milesrefreshfile.txt.
In Milestones Project Interface, Milestones
Refresh, added an option Ignore Times When Refreshing
April 2, 2008
An option to enable extra highlighting of the currently selected menu
tab when using the Enhanced Toolbar is now available under Tools |
Program Options | General. This option is most useful if you are using
the enhanced toolbar on the side or are not using gradient fills on the
toolbar.
April 1, 2008
Any user defined menus are now also displayed in the Enhanced Toolbar
rendition of the Help menu.
In the Microsoft Project Interface, Finish Dates plus Status
Milestones template in Microsoft Project template is now refreshable.
March 18, 2008
In the Microsoft Project Interface, Refresh option, in list of drop
down text fields, Text 22 field was listed as "Test 22". This typo has
been corrected.
In the Microsoft Project Interface the Project Interface help file
has been updated.
In the Microsoft Project Interface extra cr/lf at end of tags are
removed.
When cell text is edited, either in the Enhanced Toolbar, or in the
Column Text and Task Row Properties dialog, the situation where numerical
values are backspced out in Values columns is now better handled.
March 5, 2008
In the Microsoft Project Interface, updated Baseline Plus Actual with
Status template. Updated accompanying code to yield more aesthetically
pleasing results.
February 21, 2008
In the Microsoft Project Interface, fixed ?? on refresh error
occurring when using text field to update.
In the Microsoft Project Interface, added option to highlight
refreshed dates. Also added option to toggle highlight off/on (on
connections tab).
In the Microsoft Project Interface, added option to reset dates range
to refresh option (previously, no choice. Date range was set).
Fixed another problem in copy all pages to PowerPoint feature.
February 7, 2008
In the Microsoft Project Interface, added option to reset dates (or
not).
Fixed problem to copy all pages to Powerpoint.
Added current symbol color to status bar display for selected symbol.
February 6, 2008
In the Microsoft Project Interface, fixed Earned Value - SPI
Percentage Bar option.
Added an option to SPI Percentage Bar option to use a Date field for
status.
In the Microsoft Project Refresh - option for using Text field was
not working in all cases.
Corrected several standard templates, including earned value
templates.
November 30, 2007
Added an Increase/Decrease size by percent control to Enhanced
Graphic Toolbar.
November 29, 2007
Corrects issue with in the Coded Summary/Coded Symbols MS Project
import format.
Corrects issue that sometimes would cause an unwanted white
rectangle near angled freeform text.
Corrects issue that sometimes would cause the wrong file to
be specified for an MS Project Refresh.
November 12, 2007
Corrects issue with some summary line and other computed values not
displaying properly in text placed on clipboard when using the Copy
Schedule to Clipboard option.
November 8, 2007
Adds baseline dates to the export to project option in the MS Project
Interface.
Corrects an error 13 in the MS Project Interface on non-English
systems.
November 6, 2007
Corrections to several of the earned value and dashboard templates in
the MS Project Interface.
November 1, 2007
Correction to error encountered in MS Project Interface concerning
Earned Value data import.
October 31, 2007
Cost Account Plan template updated to use time-scaled BCWP and BCWS
from MS Project.
Correction to error encountered in MS Project Interface when empty
tasks are encountered.
October 26, 2007
Correction to error that prevented some import choices from being
available.